Synergy Group
(江苏地区)机械、设备制造业
如何确认产线工人的工时?
(第三期)
本期价值要点:
产线工人的准确工时,到底如何确认?
纠结的企业:
产线工时确认的必要性,在上一期的“效率统计”环节中,已经得到广大会员的认可。出于成本分析的目的,一个产品在生产过程中,经历几道工序?花费多少时间?每道工序的成本是多少?……这些问题本身的答案将有助于企业精准核算每一件产品的真实成本。
但是,要想真正有效解决这些问题,我们将不得不再次面临一个“老生常谈”的话题——产线工人的效率,因为“料工费”三项中,只有工是最难准确计算的。而只有真正从实际着手,了解了工人每个小时都在干些什么,财务才能将实际的“工”准确地计算入产品成本中去。
通过第二期活动的交流后我们发现,要想精确核算产线工人的工作内容,不引入一些现代化科技手段,是无法准确、而且使人信服的。因此,找到具有类似执行经验的同行来进行经验的分享、给出指导意见,会是最好最有效的方法。
本次,F-Council将邀请Litens Automotive Group的运营经理,现场分享Litens是如何利用现代化运营及扫描系统,将产线工人的工作状态准确收集的。
特邀嘉宾主持人
运营经理 莱顿中国
议程安排
13:00-13:30 签到
13:30-15:00 Part One: 嘉宾分享:Litens的运营系统如何收集产线工人工作状态的?
15:00-15:15 茶歇
15:15-16:00 Part Two: 参会同行探讨——如何复制Litens的经验在企业自身
16:00-16:30 对下一期SG活动内容的期许
KEY VALUE OF THE EVENT
How to check the production line worker's hours?
PROFESSIONALS’ DILEMMA
Necessity of production-line work, in the last issue of "statistical efficiency" section, has been recognized by the general membership. For costing purposes, a product in the production process, going through several processes? How much time? How much is the cost of each procedure?…… The answers to these questions alone will contribute to the accurate accounting of the true costs of each product.
However, to be truly effective solutions to these problems, we will again have to face a "cliché" topics--the efficiency of the production-line worker, because only workers are the most difficult to accurately calculate. Actually only really started, understand what the workers are doing every hour, finances can be the actual "work" accurate product cost calculation.
Through exchanges we discovered after phase II activities last time, to accurately accounting production-line worker job description, don't introduce some modern scientific and technological means, is not accurate, and convincing. Therefore, to find peers with similar implementation experience for experience sharing, gives guidance, will be the best and most effective way.
This time, F-Council will invite Litens Automotive Group Operations Manager, site sharing how to use modern operating and scan systems to check the production-line worker for operation of gathering accurate.
MODERATOR
Operation Manager Litens Automotive Group
EVENT AGENDA
13:00-13:30 Sign in
13:30-15:00 Part One: Moderator sharing: How to collect workers ' work status in Litens?
15:00-15:15 Tea Break
15:15-16:00 Part Two: Panel discussion——How to copy the sharing from Litens?
16:00-16:30 SG content expectations for the next period.